EQUIPMENT-INTERNAL WIRING

Data Center Wire Solutions

Wire options for the rack and the power equipment supporting it. Match each connection to its circuit, routing, temperature and termination requirements.

Request wire selection support

Choose your equipment.

01 / INSIDE THE RACK

Rack Internal Power Wire

For power shelves, BBU, rack PDU and server power equipment. Compare conductor size, finished diameter, thermal duty, bend space and terminal compatibility.

Explore rack power wire →

02 / SUPPORTING POWER INFRASTRUCTURE

Energy Storage & Distribution Control

For BESS, UPS, distribution cabinets and control equipment. Separate power, auxiliary and control requirements before selecting a construction.

Explore storage & control wire →

Specification-led wire selection.

01

Define the circuit

Equipment, working voltage marked AC or DC, current duty and operating environment.

02

Match construction

Gauge, stranding, insulation dimensions, routing space and termination method.

03

Review & evaluate

Applicable specification, approval scope and agreed sample requirements.

Selection guidance only. A candidate UL AWM style is not equipment approval or a statement of GFINE certification coverage. Confirm the exact supplied construction, current UL information, GFINE file coverage, conductor range, AC/DC rating and required flame test before supply. Do not infer a DC rating from an AC rating.

Start with one connection.

Send the equipment type, connection drawing or BOM line, working voltage (AC/DC), current profile, ambient temperature, gauge, maximum finished diameter, terminal details and required approvals.

Alex | Sales Manager
Jiaxing Gfine Cable Co., Ltd
Part of Kangweisheng Cable

sales01@gfinecable.com  |  +86 183 2481 1172 / WhatsApp

Contact GFINE